Gymnasium

This part of the addition will be used for many different purposes. It will allow us to hold different programs at the same time, host community events, space for students to burn energy, and allow for growth into more outreach opportunities.

Entry

The new entry is a very important space. It welcomes all who enter and lets them know this is a place where the love of Christ is shared freely to all who walk through our doors. It will also provide improved safety measures and handicap accessibility.

Classroom and Storage

The favorite area for some students, this renovated area will store craft supplies, and serve as an area where students can devote their time to crafts and learning with out distractions.

Kitchen

The heart of the ministry center is the kitchen, where we will feed students physically and spiritually. This addition to the building will allow us to minister to students and families in a whole new way.

Multipurpose area

This renovated area is where the lessons will be taught, games will be played, and students will grow.

UBMoffice

Office Space/Conference Room

We have always said ministry does not happen in an office, but we sometimes need a place to get organized. This renovated space will allow us that, have some storage, and be able to hold board meetings where we are privileged to set vision for the future.

Mechanical/Storage Spaces

These spaces are not glamorous but completely necessary Keeping us warm in the winter and cool in the summer with updated efficiency and providing storage for the ministry, these new and renovated rooms are every bit as important as the rest.

Roof & Exteriors

The existing building is in desperate need of a new roof both for energy conservation and keeping the place dry. The exteriors will be updated to prevent building corrosion and create an inviting place to come.

Restrooms

Handicap assessable up to code bathrooms will be a great addition. Located centrally between the gymnasium and renovated building.

Bowling Lanes Upgrade-Phase 3

A pastime for years, we could not lose these bowling lanes. The only part of the building that will remain unchanged during this project is still in need of some updates to keep things rolling smoothly.